Testimonials

Atec has completed work for.


CRS Conservatory Roof Supplies

‘We tendered the contract for the overhaul of our lighting systems out to several companies, it was the professionalism and reputation of A-Tec that secured them the contract. Not only that but due to the excellent standard of work and timescales of completion, we have given them further work fitting isolation switches for our industrial standard machinery’. 
Gary Mckean- Director


Grannys Kitchen


Greenbaize


Camden fire and pine - Jon Moore

‘We we’re looking for a bespoke solution to help us upgrade our current sales office and warehouse, A-Tec provided us with a complete Lighting system design and installation, fully re-wired our warehouse and installed a CCTV and intruder alarm system. We can’t speak highly enough of them, from initial assessment to the completion of the work, their attention to detail was impeccable.’
John Moore - Director


Powerhouse Gym

‘A-Tec Completed work in several stages recently at our Fitness centre. We employed them to install a fire detection system, emergency lighting and re-wire and replace our entire lighting system. There work was completed to the highest standard and with minimal disruption to our business, which was of paramount importance. Their team is highly dedicated and greatly recommended’
Frank Pitcher - Owner

Friend Link: Timberland 6 Inch Boots Herren Nike Air Max 2016 Nike ELASTICO Finale III Street TF Adidas Messi 16.3 IC MBT Lami Damen TIMBERLAND CHUKKA BOOTS Adidas Superstar 2 Shoes Friend Link: NIKE ROSHE TWO FLYKNIT SHOES AIR JORDAN 23 Adidas Originals NMD Adidas Yeezy Boost 550 Adidas Tubular Schuhe Adidas Springblade Schuhe ADIDAS D ROSE 7 MEN Friend Link: Adidas Originals Pride Pack Adidas Originals Stan Smith W Adidas Originals ZX 500 Adidas Climacool Boat Lace NIKE AIR FORCE 1 07 HIGH MBT BARIDI WOMEN AIR JORDAN 2 MEN